Short Lead Time for End Of Hose - Ximai Grouptwin Wall Boom Pipe for Putzmeister Concrete Pump (DN100 4.5") – Ximai
Short Lead Time for End Of Hose - Ximai Grouptwin Wall Boom Pipe for Putzmeister Concrete Pump (DN100 4.5") – Ximai Detail:
Basic Info
Cross-Section Shape
Round
Connection Type
Flange
Inner Layer Hardness
up to HRC67
Length Deviation
+/-1mm
Test Pressure
280bar
Weld Tensile Strength
480bar
Surface Coating
Baking Paint
Theoretical Weight (Lbs./Kg.)
101/46
Hardened Process
UHF Quenching (400kHz)
Trademark
XIMAI
Transport Package
Waterproof Packaging + Flange Sheath + Bundling
Specification
DN125*4.85(3.2+1.65)*3000mm
Origin
China
HS Code
8413910000
TWIN WALL BOOM PIPE DN125 4.85mm
TWIN WALL BOOM PIPE DN125 4.85mm (3.25m + 1.6mm) | with 148mm chrome alloy liner weld ends | |||||||
Part Number | Length(in/mm) | Theoretical weight(lbs./kg.) | HardenedProcess | HardnessHRC | LengthDeviation | TestPressure | WeldTensileStrength | SurfaceCoating |
TW485W50L1M | 39.37/1000 | 36/15 | UHF Quenching(400KHz) | UP to 68 | ±1mm | 170bar | >480bar | Baking paint |
TW485W50L2M | 78.75/2000 | 71/31 | UHF Quenching(400KHz) | UP to 68 | ±1mm | 170bar | >480bar | Baking paint |
TW485W50L3M | 118.12/3000 | 101/46 | UHF Quenching(400KHz) | UP to 68 | ±1mm | 170bar | >480bar | Baking paint |
TW485W50L4M | 157.48/4000 | 135/61 | UHF Quenching(400KHz) | UP to 68 | ±1mm | 170bar | >480bar | Baking paint |
TW485W50L6M | 236.22/6000 | 202/92 | UHF Quenching(400KHz) | UP to 68 | ±1mm | 170bar | - | Primer |
Product detail pictures:
Related Product Guide:
Fast and fantastic quotations, informed advisers to help you choose the correct products that suits all your needs, a short manufacturing time, responsible good quality control and distinct companies for paying and shipping affairs for Short Lead Time for End Of Hose - Ximai Grouptwin Wall Boom Pipe for Putzmeister Concrete Pump (DN100 4.5") – Ximai , The product will supply to all over the world, such as: Munich, Austria, Italy, We believe that good business relationships will lead to mutual benefits and improvement for both parties. We have established long-term and successful cooperative relationships with many customers through their confidence in our customized services and integrity in doing business. We also enjoy a high reputation through our good performance. Better performance will be expected as our principle of integrity. Devotion and Steadiness will remain as ever.
By Maud from Bogota - 2017.02.18 15:54
The factory workers have rich industry knowledge and operational experience, we learned a lot in working with them,we are extremely grateful that we can encount a good company has excellent wokers.
By Daniel Coppin from Azerbaijan - 2017.11.20 15:58
Send your message to us:
Write your message here and send it to us